TaRaN.rbk
ImmorTaL KhalsA
The Floating Bridge project is part of an integrated system, implemented that will reduce the traffic congestion. The number of lanes that cross Dubai Creek will increase from 19 to 38 lanes by 2007 and to 45 lanes by 2008.
The Floating Bridge, a first-of-its-kind project in the UAE, will be built out of 20-metre-wide hollow concrete blocks that will float on water. The rolling segment of the bridge allows the bridge to open and close at intervals of 20 minutes. These opening and closing times will be set in coordination with the authorities regulating the movement of ships and ferries crossing Dubai Creek.